Dedicated Freight Corridor Project, Western Corridor, India -ETCS Project

The project includes RAM and Safety Assurance for Hitachi for the Signalling and Telecommunications Works for Rewari – Makkarpura Section of the Western Corridor. The scope includes review of RAM & Safety analysis and System Assurance for HITACHI for the STP 5 project. The activities include

  • RAM Plan for Train Control and Signalling System

    • Failure Modes, Effects and Criticality Analysis (FMECA)
    • Generation of Reliability Critical Item List (RCIL)
  • Safety Analysis

    • Preliminary Hazard Analysis (PHA)
    • Interface Hazard Analysis
    • Subsystem Hazard Analysis
    • Operating Hazard Analysis
    • Fault Tree Analysis
    • Failure Modes, Effects and Criticality Analysis
  • System Assurance
  • RAMS Demonstration
  • Service Life Analysis