Dedicated Freight Corridor Project – TPWS
The project includes RAM and Safety Assurance for Hitachi for the Train protection and warning system for Rewari – JNPT Section of the Western Corridor. The scope includes production of RAM & Safety analysis and System Assurance for HITACHI for the STP 5A project. The activities include
Failure Modes, Effects and Criticality Analysis (FMECA) including RCIL
Interface Hazard Analysis
Subsystem Hazard Analysis
Operating Hazard Analysis
Fault Tree Analysis
System RAM Analysis