Dedicated Freight Corridor

Project
Dedicated Freight Corridor
Location
Western Corridor, India
Scope of Work

The project includes RAM and Safety Assurance for Hitachi for the Signalling and Telecommunications Works for Rewari – Makkarpura Section of the Western Corridor. The scope includes review of RAM & Safety analysis and System Assurance for HITACHI for the STP 5 project. The activities include

RAM Plan for Train Control and Signalling System

  • Failure Modes, Effects and Criticality Analysis (FMECA)
  • Generation of Reliability Critical Item List (RCIL)

Safety Analysis

  • Preliminary Hazard Analysis (PHA)
  • Interface Hazard Analysis
  • Subsystem Hazard Analysis
  • Operating Hazard Analysis
  • Fault Tree Analysis
  • Failure Modes, Effects and Criticality Analysis

System Assurance
RAMS Demonstration
Service Life Analysis

Status
Ongoing